Client: Wembley Arena
Project Value: £35,000,000
Location: London, UK
Works were focused on the relocation of the main Stage to the other end of the arena and subsequent reconfiguration of MEP & Seating. With the relocation of the stage, seating was also relocated to the original stage position. Construction works included structural enhancements to existing seating, increase in seating capacity, new MEP installations including refrigerant pipework to the perimeter of the arena, strip-out and replacement of finishes to public circulation areas and extensive de-watering works, making good and replacement of materials to the basement (old Empire swimming pool) which was flooded. Commercial Management Services were provided inception – completion in 2005.